FREE SHIPPING ON ORDERS OVER $30

STRAIGHT BOILER FILLING LOOP QTY - BAG QTY 1 Sale!

STRAIGHT BOILER FILLING LOOP QTY – BAG QTY 1

(3 customer reviews)

$19.99 $15.99

Here at Future Build Supplies Ltd we have on offer a flexible braided hose filling loop, which will manually fill the system. Lever operated. 15mm Compression Ends. Double check valve stop valve. Stainless steel flexible braided hose. Easy to use/ Easy to

  • Zero-Risk Assurance: Full-Refund Policy
  • Free Delivery on 30+ Orders
  • 60-Day Hassle-Free Returns


Introduction

Here at Future Build Supplies Ltd we have on offer a flexible braided hose filling loop, which will manually fill the system. Lever operated. 15mm Compression Ends. Double check valve stop valve. Stainless steel flexible braided hose. Easy to use/ Easy to disconnect. Description: This Filling Loop will manually fill and top up a closed central heating system. The loop incorporates a lever operated valve and non-return valve and should be fitted between the water main and the central heating system. This flexible hose is easy to disconnect from the water main when finished as recommended.

Specification
Part No: B07GR4M2FG
Weight, kg: 0.280000
Brand: Embrass
Barcode: 6289760699660

Shipping Info

Standard Shipping

Cost: $25

Free Shipping

We offer free shipping on orders over $30. Please check the free - shipping eligibility at checkout.

Delivery Time:

It usually takes [3-5] business days for standard shipping. Please note that this is an estimated time frame and may be affected by local holidays, and unforeseen circumstances.

Reviews

There are no reviews yet.

Be the first to review “STRAIGHT BOILER FILLING LOOP QTY – BAG QTY 1”

Your email address will not be published. Required fields are marked *

Related products